Mercedes-Benz of Naples

501 Airport Rd S.Naples, FL 34104

2024 BMW M4 Competition at Mercedes-Benz of Naples

2024 BMW M4 Competition

Selling Price : $75,495

Vehicle Photos

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 23,189
  • VIN : WBS33BA0XRCP73707
  • Stock # : L594044A
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Black
  • Int. Color : Silverstone/Black
  • Vehicle Type : Convertible
  • Body Style : 2D Convertible
  • Drivetrain : AWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

**LOCAL TRADE-IN, **ONE OWNER, 2024 M4 COMPETITION COVERTIBLE IN BLACK EXTERIOR WITH SILVERSTONE FULL MERINO LEATHER INTERIOR IS EQUIPPED WITH POWER SEATS, EXECUTIVE PACKAGE, HEATED STEERING WHEEL, PARKING ASSISTANCE PACKAGE, DRIVING ASSISTANCE PACKAGE, BLIND SPOT MONITOR, BLACK SOFT-TOP, M SEAT BELTS, CARBON FIBER TRIM, FRONT VENTILATED SEATS, HARMAN KARDON SURROUND SOUND SYSTEM, WIRELESS CHARGING, PARKING SENSORS, 19/20" M DUAL SPOKE WHEELS AND MANY MORE OPTIONS. CALL US OR SENT AN EMAIL TO SCHEDULE A TEST DRIVE..
Thank you for taking the time to look at this vehicle. We can provide you with a personalized video, CarFax, known service history, pictures and any information that makes your decision simple and easy. We provide the market place with cars we are proud of and want our customers to feel the same way. Thanks again and let us know how we can assist you.

Browse Other Vehicles at Mercedes-Benz of Naples

Dealership Info

Mercedes-Benz of Naples

Mercedes-Benz of Naples

Vehicle Features

  • Navigation
  • Navigation System
  • Connected Package Pro
  • Driving Assistance Professional Package
  • Executive Package
  • Parking Assistance Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Neck Warmer
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Integrated roll-over protection
  • Knee airbag
  • Low tire pressure warning
  • Occupant sensing airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Active Driving Assistant Pro
  • Extended Traffic Jam Assistant
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Convertible roof wind blocker
  • Heated door mirrors
  • Icon Adaptive LED Headlights w/Laserlight
  • M Shadowline Lights
  • Parking Assistant Plus
  • Power door mirrors
  • Turn signal indicator mirrors
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW Curved Display w/HUD
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Convertible roof lining
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Personal eSIM 5G
  • Power convertible roof
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Widescreen Display
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Glass rear window
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers
  • **LOCAL TRADE-IN
  • **ONE OWNER
  • 2024 M4 COMPETITION COVERTIBLE IN BLACK EXTERIOR WITH SILVERSTONE FULL MERINO LEATHER INTERIOR IS EQUIPPED WITH POWER SEATS, EXECUTIVE PACKAGE, HEATED STEERING WHEEL, PARKING ASSISTANCE PACKAGE, DRIVING ASSISTANCE PACKAGE, BLIND SPOT MONITOR, BLACK SOFT-TOP, M SEAT BELTS, CARBON FIBER TRIM, FRONT VENTILATED SEATS, HARMAN KARDON SURROUND SOUND SYSTEM, WIRELESS CHARGING, PARKING SENSORS, 19/20" M DUAL SPOKE WHEELS AND MANY MORE OPTIONS. CALL US OR SENT AN EMAIL TO SCHEDULE A TEST DRIVE.

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.