2023 BMW M4 Competition at Mercedes-Benz of Naples
https://mercedes.dealerleads.com/cars/Used/2023/BMW/M4/Competition/167788052023 BMW M4 Competition
Selling Price : $74,985
Vehicle Photos
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 2,457
- VIN : WBS33BA08PCL58415
- Stock # : 096745A
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : White
- Int. Color : Fiona Red/Black
- Vehicle Type : Convertible
- Body Style : 2D Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- M Sport Seats
- Extended Merino Leather Upholstery
- Front Ventilated Seats
- Radio: AM/FM Audio System
- Driving Assistance Professional Package
- Parking Assistance Package
- Executive Package
- M Compound Brakes w/Red Calipers
- M Shadowline Lights
- Carbon Fiber Trim
- Icon Adaptive LED Headlights w/Laserlight
- Wireless Charging
- Remote Engine Start
- Heated Steering Wheel
- Power Front Seats
- Lumbar Support
- Extended Traffic Jam Assistant
- Active Driving Assistant Pro
- Parking Assistant Plus
- Head-Up Display
- SiriusXM Satellite Radio
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Enhanced USB/Bluetooth Plus Smartphone Integration
- Live Cockpit Pro w/Navi
- WiFi Hotspot
- Apple CarPlay & Android Auto Compatibility
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Speed-sensing steering
- Speed control
- Security system
- Remote keyless entry
- Rear window defroster
- Rear seat center armrest
- Rear reading lights
- Rear anti-roll bar
- Rear air conditioning
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Power convertible roof
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead console
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Integrated roll-over protection
- Illuminated entry
- Heated front seats
- Heated door mirrors
- Glass rear window
- Garage door transmitter
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Convertible roof wind blocker
- Convertible roof lining
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Navigation System
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.


Thank you for taking the time to look at this vehicle. We can provide you with a personalized video, CarFax, known service history, pictures and any information that makes your decision simple and easy. We provide the market place with cars we are proud of and want our customers to feel the same way. Thanks again and let us know how we can assist you.